The work

One crew, the whole mechanical scope.

Developers and EPCs bring us in to handle the part of the project where things actually get built. We’re not the salesperson and we’re not the absentee GC. We’re the crew that mobilizes, drives the piles, sets the racking, lays the modules, and hands back a documented, energized array.

If you have multiple similar sites, we want that conversation early. Repetition lets us tighten the plan, sharpen pricing, and keep the same build logic moving from project to project.

Because we self-perform across foundation types, we match the method to your geotech and your schedule instead of forcing the site to fit one trick.

Foundations

Every way into the ground.

01

Pile-Driven

Our bread and butter. Driven W- and C-section piles for fixed-tilt and tracker arrays. We tune our daily rates to embedment depth and post length, right up to the tall 20-footers that have to be rigged, slung, and set with a GRT.

EMBEDMENT-RATED · RIGGED POSTS · GRT
02

Ballasted

Ballasted ground-mount for sites you can’t drive into. Precast or cast-in-place, laid out and set to the engineered wind and uplift numbers.

PRECAST · CAST-IN-PLACE
03

Capped Landfill

Landfill and brownfield redevelopment without penetrating the cap, the kind of work that turns dead acreage into a producing asset.

NO-PENETRATION · BROWNFIELD
04

Screw / Helical

Ground screws and helical piles for variable soils, rock, and sites where reduced disturbance or removability matters.

GROUND SCREW · HELICAL
05

Refusal Remediation

Every refusal tracked to its location with the fix logged: pull-tested, cut-and-punch, cut-and-drill, galvanized. Nothing falls through the cracks at closeout.

PULL TEST · CUT & PUNCH · GALV
06

Pull Testing

In-field pull and load testing to verify embedment and capacity, documented against the engineered spec for every questionable location.

LOAD VERIFICATION
Structures & modules

Steel up, modules on.

07

Fixed-Tilt Racking

Fixed-tilt structures squared, leveled, and torqued to spec, with tilt and clearance handled per the project drawings.

RACK · TORQUE-TO-SPEC
08

Single-Axis Tracker

Tracker mechanical install: torque tubes, bearings, dampers, drivelines, and module attachment, all built to the tracker OEM’s tolerances.

TORQUE TUBE · BEARINGS · DAMPERS
09

Module Installation

High-volume module installation with production rates that hold the schedule, plus handling protocols that protect the modules and the warranty.

HIGH-VOLUME · WARRANTY-SAFE
Field discipline

The difference is in the details.

Anyone can drive a pile. The reason developers and EPCs keep hiring us is everything that wraps around it.

  • AExperienced crewsForemen and field crews who have done this for years, not a rotating cast learning on your project.
  • BSafety first, alwaysOSHA-certified crews and daily safety sign-off. Zero injuries is the standard, not the aspiration.
  • CSchedule we hold toPhased plans with realistic daily production rates, and the manpower and equipment to hit them.
  • DQuality control in the fieldWork checked as it goes in: embedment, torque, alignment. We catch problems early, not at closeout.
  • EIRA apprenticeship complianceApprentice labor-hour ratios staffed and documented to keep your tax credits intact.
  • FClean closeoutAs-built redline drawings and complete documentation delivered the way your contract requires.
Who we serve

Built for developers and EPCs.

Our clients are the developers financing these assets and the EPCs and general contractors responsible for delivering them. We slot in as the install partner, bondable, insured, and national, so you can hand off the field scope and stop worrying about it.

We work coast to coast and adapt to the systems and reporting your project already runs on, whether that’s our platform or yours.

Start the conversation
Clients
Developers & EPCs
Sectors
Commercial & utility
Project size
1-50 MW
Systems
Ground-mount only
Geography
All 50 states
Portfolio fit
Built for repeat work

Match the method to your site.

Send us your system type, geotech, and schedule. We’ll tell you how we’d build it.